Skip to main content

Integration and test activities for the SUMIRE Prime Focus Spectrograph at LAM

Author(s): Madec, F; Jaquet, M; Pascal, S; Bozier, A; Le Mignant, D; et al

Download
To refer to this page use: http://arks.princeton.edu/ark:/88435/pr19w08z4v
Abstract: The Prime Focus Spectrograph (PFS) of the Subaru Measurement of Images and Redshifts (SuMIRe) project for Subaru telescope consists in four identical spectrographs feed by 600 fibers each. Each spectrograph is composed by an optical entrance unit that creates a collimated beam and distributes the light to three channels, two visible and one near infrared. We present here the integration process of the first spectrograph channel. The verification requirements, the specific integration requirements and the product tree are the main drivers from the top plan for the Assembly Integration and Test (AIT) development process. We then present the AIT flow-down, the details for the AIT processes as well as opto-mechanical alignment procedures and tests setup. In parallel, we are developing and validating dedicated tools to secure and facilitate the AIT activities, as we have to assemble eight visible cameras, integrate and align four fiber slits, integrate and align the components of four spectrographs.
Publication Date: 2014
Citation: Madec, F, Jaquet, M, Pascal, S, Bozier, A, Le Mignant, D, Vives, S, Ferrand, D, Pegot-Ogier, T, Arthaud, G, Golebiowski, M, Sugai, H, Tamura, N, Gunn, J, Smee, S, Oliveira, L. (2014). Integration and test activities for the SUMIRE Prime Focus Spectrograph at LAM. GROUND-BASED AND AIRBORNE INSTRUMENTATION FOR ASTRONOMY V, 9147 (10.1117/12.2056577
DOI: doi:10.1117/12.2056577
ISSN: 0277-786X
Type of Material: Conference Article
Journal/Proceeding Title: GROUND-BASED AND AIRBORNE INSTRUMENTATION FOR ASTRONOMY V
Version: Final published version. Article is made available in OAR by the publisher's permission or policy.